Wednesday, December 30, 2009

The Triangle

Am posting this in the winter of 09-10 as a way of getting to know how to use the blog.

Tuesday July 7th Crysler Park Marina

Weather dark and raining, but no wind. Decided to take the boat with its newly repaired hose out for a good run, if temperature gauge remains OK and weather holds, then we will continue. Both held, so on to the Eisenhower lock. No hold up there. At Snell Lock, waited for a big ship to lock through, then we were on our way. Weather remains dark and wet. Arrived Creg Quey marina mid afternoon, then the sun came out.

July 5th, 2009

We started our trip around the triangle (Crysler Park Marina to Montreal, up the Ottawa, down the Rideau to Kingston, then back to CPM) on Sunday, 5th of July. It is a beautiful sunny day. Got out of the marina to the main channel and the port engine started overheating. Turned it off and returned to the marina. It was breezy, thank goodness for some sailboaters on our dock who helped us dock. Wayne checked the engine, seems like there is not enough water getting in to cool the engine. Impeller OK, perhaps a blockage in the through-hull; Grant from B dock came over to help with problem solving, very helpful. Hired a diver to check clamshell for obstructions, saw nothing. Tried poking blades down through the seacock and clamshell several times, eventually more water coming in. Seems that something had built a nest inside the clamshell. Had cut off the hose to get at the through-hull, spent the rest of that day and the next day trying to find another hose. Ended up using a heavy plastic hose like one used on a swimming pool hookup.